Working Process
How Your Project Comes to Life
Step 1
Planning & Design
We define goals, budget, layout, and style, then select tile, vanity, countertops, fixtures, lighting, and the shower or tub.
Layout & Style
Tile & Fixture Selection
Budget & Timeline
Step 2
Permits & Preparation
We determine which permits are required, order materials, and prepare and protect the work area.
Permit Review
Material Ordering
Site Protection
Step 3
Demolition & Layout Changes
The existing tub, shower, vanity, flooring, and finishes come out. We inspect for hidden water damage, mold, or structural issues, then adjust walls and framing as needed.
Demolition
Damage Inspection
Framing Changes
Step 4
Plumbing, Electrical & Waterproofing
Plumbing is relocated or added, electrical, lighting, and the exhaust fan are updated, then the shower area is waterproofed with the pan and drainage set correctly.
Plumbing & Electrical
Waterproofing
Shower Pan & Drainage
Step 5
Tile, Vanity & Countertop
Backer board and flooring go in and shower and wall tile is set, then the vanity, countertop, sink, and faucet are installed.
Shower & Wall Tile
Flooring
Vanity & Countertop
Step 6
Fixtures & Walkthrough
Toilet, shower fixtures, mirrors, hardware, and shower glass are installed, walls and trim are painted and caulked, then we finish inspections, the punch list, and the final walkthrough.
Fixtures & Glass
Paint & Trim
Punch List
Step 1
Planning & Design
We define goals, budget, layout, and style, then select tile, vanity, countertops, fixtures, lighting, and the shower or tub.
Layout & Style
Tile & Fixture Selection
Budget & Timeline
Step 2
Permits & Preparation
We determine which permits are required, order materials, and prepare and protect the work area.
Permit Review
Material Ordering
Site Protection
Step 3
Demolition & Layout Changes
The existing tub, shower, vanity, flooring, and finishes come out. We inspect for hidden water damage, mold, or structural issues, then adjust walls and framing as needed.
Demolition
Damage Inspection
Framing Changes
Step 4
Plumbing, Electrical & Waterproofing
Plumbing is relocated or added, electrical, lighting, and the exhaust fan are updated, then the shower area is waterproofed with the pan and drainage set correctly.
Plumbing & Electrical
Waterproofing
Shower Pan & Drainage
Step 5
Tile, Vanity & Countertop
Backer board and flooring go in and shower and wall tile is set, then the vanity, countertop, sink, and faucet are installed.
Shower & Wall Tile
Flooring
Vanity & Countertop
Step 6
Fixtures & Walkthrough
Toilet, shower fixtures, mirrors, hardware, and shower glass are installed, walls and trim are painted and caulked, then we finish inspections, the punch list, and the final walkthrough.
Fixtures & Glass
Paint & Trim
Punch List
Know before you book
Frequently Asked Questions
Transparent details. No surprises.
Are estimates free?
What colors, textures, and edge styles are available?
How far in advance should I schedule my project?